Gas Station Project of 31.98 kW in Nanchang, Jiangxi

Release Date:2026-03-30Source:Hangzhou Ginpon New Energy Co.,Ltd.

Jiangxi Nanchang Gas Station 31.98kW PV Plant

📍 Location: Nanchang, Jiangxi, China | ⚡ Capacity: 31.98 kWp | 🔧 Solution: Module-level microinverter system | ✅ Completion: [Month] 2025
 

一、Core Equipment Configuration

📦 PV Modules

  • High-efficiency Monocrystalline Modules
  • Fire-resistant, anti-PID, low degradation

⚡Microinverter

  • 2kW Single-phase Microinverter (IP67)
  • Qty: 17 units (1-to-4)
  • DC Voltage: ≤60V (safe voltage)
  • AFCI / Module-level MPPT

🛠️Mounting & Accessories

  • Aluminum lightweight mounting (wind resistance level 12, 25-year anti-corrosion)
  • PV-specific flame-retardant oil-resistant cable (explosion-proof compliant)
  • AC combiner box, smart meter, anti-reverse device

二、Design Highlights (Gas Station Exclusive)

  • Ultimate Safety:≤60V DC, no high-voltage arcing, fully compliant with gas station explosion-proof/fire codes.
  • High Power Generation:Module-level MPPT, 5–15% more generation under shade/dust.
  • Non-stop Construction:Modular, no high-voltage work; zone construction without business disruption.
  • Smart Monitoring:Module-level remote monitoring, precise fault location and early warning.
  • High Reliability:Single microinverter failure auto-isolates, 99.9% system availability.

三、Generation & Economic Benefits

First-year Generation: 35,200 kWh
Annual Electricity Cost Savings: ~26,400 yuan (0.75 yuan/kWh)
Self-consumption Rate: 75%~85%
Annual CO₂ Reduction: 28 t
Payback Period: 5.2 years
25-year total generation: 820000 kWh
25-year total revenue: ≈660k yuan

四、 Implementation Process

  • Site survey: roof load, shading, safety clearance assessment.
  • Design: microinverter layout, electrical, explosion-proof, and fire protection engineering.
  • Filing & grid connection: Registration with Nanchang DRC, grid access approval.
  • Material delivery: explosion-proof/flame-retardant/oil-resistant inspection.
  • Zoned construction: mounting → modules → microinverters → AC wiring → grid connection.
  • Commissioning & acceptance: insulation, grounding, protection, monitoring, explosion-proof check.
  • Grid connection: operation starts, 24/7 monitoring online.

五、Project Value & Significance

✅ Nanchang AreaAll-Microinverter Gas Station PV Benchmark,eliminating DC high-voltage safety hazards
✅ Annual electricity cost reduction20%+,25-year stable returns, excellent ROI.
✅Included in Nanchang CityOil-Gas-PV-Charging IntegrationGreen Energy Station System
✅For Jiangxi ProvinceGas Stationprovides a replicable standard solution for PV retrofits

 

Share to:0 On mobile
江西南昌市加油站31.98 kw项目

Scan QR code for info on the go

Try scanning with your phone
Continue watching this page on your phone.